The warehouse owns the material journey from receiving to line side — where quality and delivery both begin. Components are received, inspected, stored under moisture control, kitted and traced here; one wrong reel or one damp part can become an unrecoverable loss at placement or at the customer.
What happens here
Electronic components are high value, tightly specified and sensitive to their environment. Material is stored by category, moisture-sensitive devices (MSD) are controlled by floor-life level, and ESD racks and totes cover the whole receive-store-issue cycle.
Management focus
Receiving & inspectionPart number, quantity, lot and date code checked against the PO, with appearance and packaging sampled and non-conforming material quarantined.
Moisture & ESD controlMSD parts live in dry cabinets with opening time logged; racks, totes and workstations follow ANSI/ESD S20.20.
Kitting & line feedingBOM kitting per work order, early warning on shortages and long lead-time parts, prepared to feeder for each line.
Traceability & stock accuracy
- Lot traceability: material lots are tied to the work order and, through DMES, back to the specific placement machine and production time.
- FIFO: issued by receipt date and shelf life so nothing goes stale on the shelf.
- Cycle counting: rolling counts keep system and physical stock aligned, with same-day investigation of variances.
- Remainders: production leftovers are resealed, opening cycles logged and reserved for the next order.
What it means for buyers
Kit completeness and lot traceability decide whether a delivery promise holds. We provide lot lists and approved-alternate documentation on request to support our customers' supply-chain audits.
Need a process review or quote?Send your BOM, Gerber files and estimated quantity — we reply within one working day.
GET A QUOTE