Auditing a Small-Batch PCBA Supplier: Seven Field Checks

2026-11-08 0

When purchasing changes suppliers, the process is nearly always the same: collect quotations, read the website, tour the showroom, flip through customer cases, and finally look at a "sample board". That process filters out the obvious no-hopers, but it is almost useless for the differences that actually decide delivery quality — the sample board was selected, the showroom was arranged, the cases were prepared.

What reveals the real level is the corners of the plant that visitors are normally not taken to. None of the seven details below needs specialist equipment or process expertise; half a day is enough.

1. Look at ESD at the door, not the meeting room

  • Is the wrist-strap tester actually in daily use, and are there continuous check records?
  • Are the ionizers switched on — plenty of plants have them installed and never run them;
  • Are trolleys and racks ESD-safe? Is anyone storing ICs in ordinary plastic bags?
  • Are boards lying loose on the floor, or component trays left open on the bench?

One rule of thumb is remarkably reliable: if someone in the workshop is wearing a synthetic jacket and picks up a board bare-handed, you can stop the assessment there. ESD damage does not show up in appearance; it shows up as customer-side failures three months later.

2. The solder-paste fridge and the warm-up log

Paste must be stored cold, warmed for long enough before opening, and used within its open time. Every plant does these three things; the difference is whether they are recorded, and whether the records are continuous.

  • Is there a temperature log in the fridge? Handwritten is fine, as long as it can be produced for every single day;
  • Is the warm-up start time labelled on each cartridge, and is the mixing spatula clean?
  • How are expired or returned cartridges handled, and is there a segregated area for them?

3. Changeover records: this machine, today, how many times

In a high-mix, low-volume plant, changeover happens every day and is also the moment of greatest quality variation. Ask directly for today's changeover record: changeover duration, first-article confirmation time, who confirmed, and where the first board after changeover went. A plant that says "we change over very fast" but cannot produce the record usually means there is no standard — just a senior operator's feel.

4. Is the first article signed by a person or by data?

A human visual check with a signature and a machine comparing every placement on every panel are two different orders of magnitude. The first catches obvious missing or wrong parts; the second catches offset, polarity and wrong material — the items the eye handles unreliably — and leaves comparable data behind.

The more revealing question is about process interlock: if the first article has not been confirmed, can the line start volume production by itself? If the answer is "yes, but we would not", the control depends on discipline rather than on the system.

5. AOI is not whether you have it, but the false-call rate and review rules

Many plants now have AOI; few can state their false-call rate. Three things to look at: who tunes the program, roughly what the false-call rate is, and who performs the review. Whether false calls that were passed are recorded matters more than the rate itself — every escape begins with "let it go this time".

Ask for AOI reports from three sampled batches and check whether first-pass yield and review records are continuous. Where the record breaks is where the problem is.

6. How deep does traceability go?

Traceability has three levels:

LevelWhat it can answerTypical fit
BatchWhich material lots went into this batch of boardsConsumer, general industrial
PanelWhere this panel sat and which reflow run it went throughMedium reliability requirements
UnitFor this board: reel lot, machine, program revision, operator, timeMedical, automotive, high reliability

There is a very practical field test: pull an arbitrary board from a finished carton and ask the plant to trace its material lots and placement program revision on the spot. If it comes back in a few minutes, the traceability is real; if the answer is "we will put it together and send it to you", it was usually assembled after the fact.

7. Where do the defective units go?

Look at two places: the quarantine area and the rework bench. The quarantine area needs clear marking, a log, and ideally a lock. Every board on the rework bench should be traceable to a work order, and every reworked unit must be re-inspected with the result recorded.

One question worth asking face to face: what happens to scrapped boards? Harvesting components from scrap is an open secret in the industry. Asking may be uncomfortable; not asking is the actual risk.

Finally: ask for last month's data

Everyone has prepared cases. The real material is last week's production report, the defect-rate trend over the last three months, and the corrective actions from the last three customer complaints. A plant willing to lay those open is usually also unafraid of an unannounced line audit — and that says more than any certificate.

Five questions you can read out loud

  1. What was your AOI first-pass yield last month, and who performs the review?
  2. What is your average changeover time, and who confirms the first article, on what equipment?
  3. Can you trace any board's material lots and program revision on the spot?
  4. How are defective and scrapped boards segregated and disposed of?
  5. What were the nonconformities from your last customer audit, and are the corrective actions closed?

An audit is not about finding fault; it is about finding a partner who can carry the risk for you over the long term. The closer you look up front, the less you worry later.